Protected Names & Shortcuts

Previous pageReturn to chapter overviewNext page

Protected Names

Summary!O3

Calculation Modes

Print_Area

Printable range of cells in an overhead user sheet

QDV_System_VisibleArea

Visible range of cells in an overhead user sheet

'<Sheet name>'!System_ShowHeader

Flag indicating that the headers are visible in normal mode in this sheet

'<Sheet name>'!System_ShowFormulaBar

Flag indicating that the formula bar is visible in normal mode in this sheet

QDV_NrSheets

Count of extra pairs of columns in the List of Articles of a set

CASH_DATA_Global_Range_...

Range of the Cash Data sheet

Throughput

See Timed Machinery

 

QDV_Names is a hidden sheet whose textual values can be referred to in headings when building sheets in the Overhead workbook:

- column A: Core Estimate, Overhead Task, Optional Area, TOTAL CORE ESTIMATE, OVERHEAD, OPTIONAL, ...

- column F: Liabilities, Total Liabilities, Outcome, Total Outcome, ...

- column L: Additional Outcome, Invoicing, Amount, Starting Period, Duration, ...

 

Do not use GANTT or WBS as the mnemonic of a set of fields.

<USER_NAME> refers to the Windows user name.

 

Shortcuts for Keyboard

 

ESTIMATE

 

Shift F3

Insert task

How to Develop the WBS

Shift F4

Insert sub task

Shift F6

Delete task or branch

Shift F10

Cut task or branch

Shift F11

Copy task or branch

Shift F12

Paste task or branch

F2

Edit a formula without field in the WBS or Minutes view. It shows as a comment *

How to Empower the Minutes with Quantity Calculation Capabilities

F2 twice

Open a window to edit a text cell of the WBS or Minutes view.

 

F2 (or Alt +Enter)

Wrap the cell content in WBSs, the view of Minutes and Nomenclatures

Basic Handling

Ctrl F

Find

How to Navigate the WBS, How to Navigate the Minutes

F3

Scroll through matches

In-Row Workbooks

F4

Condensed WBS-Minutes or Expanded WBS-Minutes or Planner-Minutes back and forth

Does not work when the Overhead cost minute is used and a field is selected in the view

 

In Overhead workbook: repeats the latest context selection Condensed WBS/Expanded WBS/BoQ

 

 

Show minute

Bill of Quantities

 

Switch from absolute to relative referencing ($ in formula’s)

 

F5

Compute Costs

General Interface

Shift F5

Refresh data

Ctrl F5

Compute all

F6

Group rows in the Minutes view

How to Group Rows in the Minutes

F7

Ungroup rows in the Minutes view

F10

Hide/Show group details in the Minutes view

Ctrl F6

Create a set or increase its depth in the Minutes view

How to Create Sets of Minutes

Ctrl F7

Remove a set or decrease its depth the Minutes view

Ctrl K

Copy minutes to whole estimate

How to Update an Article Row

F12

Summarize selection

Summary

Ctrl F12

Summarize whole estimate

Ctrl + Shift +

Open ...

 

F1

Condensed WBS

 

F7

Planner

 

F8

Reports

 

Shift F8

Insert reference from estimate

How to Fill in the Minutes

 

 

 

 

DATABASES

 

Ctrl A

Open database manager

Open Database

Ctrl G

Open preferential database(s)

Preferential Database

Ctrl <ten>,release, <unit>

Open a preferential database from a mini-index with more than 10 databases

How to Insert an Article or a Set Using its Reference

F7

Insertion above into the Minutes view from the articles viewer

How to Insert an Article or a Set into a Section of Minutes, How to Replace Article Rows, Nested Sets

F8

Insertion and replacement of an article selected in the articles viewer

Ctrl W

Update of article from database using a reference

How to Insert an Article or a Set Using its Reference

Ctrl P

Update of article from database using a prefix + a reference

 

 

 

F11

Glossary

Glossaries

Ctrl+Shift F11

Add bookmark

 

Ctrl F11

Open bookmark list

 

 

* when you edit a cell with a double click or the F2 key, QDV7 evaluates the formula stored in the comment:

if the result equals the displayed figure, the formula is edited

else, the value is edited instead.

 

Shortcuts for Paths

In Settings, How to Create & Manage the Databases and Built-in Function Button, you can use these shortcuts: <PROFILE_PATH>, <TEMP_PATH>, <DESKTOP_PATH>, <MY_DOCUMENTS_PATH>, <INSTALL_PATH> or <CUSTOM_PATH>.

<CUSTOM_PATH> refers to the path in the first line of the CustomPathVariable.inf file, which must be located either in the installation folder or in the C:\Users\Home\AppData\Roaming\QDV path. Restart QDV7 for this path to be evaluated.