Option: |
Gantt diagram controlled by Minutes (or Minutes and Database of the estimate) |
Gantt diagram controlled by WBS |
Displaying native/special columns in Minutes/WBS |
Task in Gantt (mandatory) Minutes & Tasks |
Task in Gantt (mandatory) WBS & Tasks |
Gantt Duration, Gantt Start Date, Gantt End Date (read only) |
Gantt Duration, Gantt Start Date, Gantt End Date (read only) |
|
Gantt Set Duration, Gantt Set Start Date (editable) |
– |
|
How to assign a row to a Gantt Task |
||
What is multiple addressing? |
When a minute involves several tasks, select Multiple and assign them a weight to break down the quantity (Material) and time (Workforce) in the planner |
– |
The minutes of the Gantt |
||
Specifics |
Taking duration and dates into account at the level of subsection (Description): it makes sense to make multiple addressing in the title |
Basing formulas on dates and duration in the minutes of WBS: Free Fields |