Converting a workbook into an estimate |
In each sheet, each column is assigned either to a template WBS field or to a template Minutes field. This creates the estimate core. |
How to map rows in a structure |
Set the level by entering X in a column 1 ... 7. Refer to Conversion of a BoQ into an Estimate. |
How to exclude rows |
Select in column A the cell of rows to exempt and click Mapping>Exclude Row. |
Mapping links to the Bill of Quantities |
Check the box Add WBS To BoQ Ref (below the WBS field list); this will be used to export the estimate values to this BoQ column. |
How links are stored to a resulting workbook |
Links are stored with the mapping. |
Which features are transposed? |
The levels can be created from the item number or appearance (bold typeface). Refer to Conversion of a BoQ into an Estimate. |
What is stored to the estimate when linking to a BoQ? |
The estimate keeps the correspondence between the linked columns of the BoQ and WBS. |
How to restore the initial BoQ workbook from QDV with no alteration |
Through Data>Microsoft Excel>Import from Microsoft Excel (alternative: right-click and select Import BoQ). |
How to change a BoQ manually later without breaking the links |
Menu Data>Edit under Microsoft Excel |